Hall 6

We designed and built the photovoltaic power plant according to the client's specific parameters, so-called turnkey. We prepared the project, secured the legislation, the connection agreement, took care of the actual implementation, as well as the final revisions. At the beginning, we provided the workers with special training from Dutch engineering, with whom we consulted the entire project from A to Z. The implementation lasted 4 months with continuous communication with the client in the form of reports and personal meetings. All processes were photographically documented in detail, we took over 1000 photos, including images and videos from the drone. Everything was carried out with maximum emphasis on health and safety. This large project ran parallel to the second Hall 5 project.


Hall 6 - total installed power of photovoltaic (PV) panels: 2936 x 470 Wp = 1,379.92 kWp